| home page | photograph category | date built | architect or builder | date photographed | location map | all by name | all by date |
| previous photo | next photo | copyright |
| Description: university: Union Road: Unilever Cambridge Centre |
| Date built: 1999-2000 |
| Architect: Erik Sørensen and Zibrandtsen Arkitekt |
|
|
| Date photograph taken: 04 Oct 2000 | (Alternative map: Google map) |
Just about finished by the end of 2000, this new wing of the Chemical Laboratory contains the departmental library, and above that on the top floor a common room.
Other photographs within 100 m:
| previous photo | next photo | copyright |
| home page | photograph category | date built | architect or builder | date photographed | location map | all by name | all by date |